Oak Grove, AL

Electric Vehicle Infrastructure & Adoption Analysis

Non-Networked FLO
2
Charging Stations

Infrastructure Grade

A

67% DC Fast

Based on DC Fast Charger ratio

2 of 3 ports

Density Metrics

Total Stations 2
Ports per Station 1.5

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

2
Charging Stations
3
Total Ports
2
DC Fast Chargers
1
Level 2 Ports

Charging Networks

Non-Networked 1 (50%)
FLO 1 (50%)

Charging Stations in Oak Grove

Alabama Power - Oak Grove Business Office - ULTRA

38001 U.S. 280
FLO
2 DC Fast
CCS/SAE Combo

Alabama Power - Oak Grove Business Office

38001 US Highway 280
Non-Networked
1 Level 2
J1772 (Level 2)

Local Insights

High-Speed Charging Hub

Oak Grove has exceptional DC fast charging coverage with 67% of ports being high-speed chargers, well above the national average.

Nearby Cities