Sitka, AK
Electric Vehicle Infrastructure & Adoption Analysis
Non-Networked
1
Charging Stations
Infrastructure Grade
F
0% DC Fast
Based on DC Fast Charger ratio
0 of 1 ports
Density Metrics
Total Stations 1
Ports per Station 1.0
Data Status
Current
Last updated: Jan 28, 2026
Data sourced from U.S. DOE AFDC
1
Charging Stations
1
Total Ports
0
DC Fast Chargers
1
Level 2 Ports
Charging Networks
Non-Networked 1 (100%)
Charging Stations in Sitka
Tongass National Forest
204 Siginaka Way
1 Level 2
J1772 (Level 2)
Local Insights
Level 2 Focused Infrastructure
Sitka's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Non-Networked Stronghold
Non-Networked leads the market in Sitka with 100% of stations, making their membership particularly valuable here.