Blytheville, AR

Electric Vehicle Infrastructure & Adoption Analysis

ChargePoint Network Non-Networked
2
Charging Stations

Infrastructure Grade

F

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

Density Metrics

Total Stations 2
Ports per Station 1.0

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

2
Charging Stations
2
Total Ports
0
DC Fast Chargers
2
Level 2 Ports

Charging Networks

ChargePoint Network 1 (50%)
Non-Networked 1 (50%)

Charging Stations in Blytheville

MCEC NORTH

474 AR-18
ChargePoint Network
1 Level 2
J1772 (Level 2)

Mississippi County Electric Co-op

474 E State Highway 18
Non-Networked
1 Level 2
J1772 (Level 2)

Local Insights

Level 2 Focused Infrastructure

Blytheville's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Nearby Cities