Buena Vista, CO

Electric Vehicle Infrastructure & Adoption Analysis

ChargePoint Network ELECTRIC_ERA
5
Charging Stations

Infrastructure Grade

A

60% DC Fast

Based on DC Fast Charger ratio

9 of 15 ports

Density Metrics

Total Stations 5
Ports per Station 3.0

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

5
Charging Stations
15
Total Ports
9
DC Fast Chargers
6
Level 2 Ports

Charging Networks

ChargePoint Network 4 (80%)
ELECTRIC_ERA 1 (20%)

Charging Stations in Buena Vista

Electric Era Charging Station

115 Harrison Ave
ELECTRIC_ERA
8 DC Fast
CCS/SAE Combo Tesla

SDCEA MAIN STREET

S Railroad St
ChargePoint Network
2 Level 2
J1772 (Level 2)

SDCEA RIVERFRONT PARK

717 E Main St
ChargePoint Network
2 Level 2
J1772 (Level 2)

SDCEA SOUTH MAIN L2

912 South Main Street
ChargePoint Network
2 Level 2
J1772 (Level 2)

SDCEA SOUTH MAIN L3

912 South Main Street
ChargePoint Network
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

Local Insights

High-Speed Charging Hub

Buena Vista has exceptional DC fast charging coverage with 60% of ports being high-speed chargers, well above the national average.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Buena Vista with 80% of stations, making their membership particularly valuable here.

Nearby Cities