La Junta, CO
Electric Vehicle Infrastructure & Adoption Analysis
ChargePoint Network EV Connect
8
Charging Stations
Infrastructure Grade
B
33% DC Fast
Based on DC Fast Charger ratio
5 of 15 ports
Density Metrics
Total Stations 8
Ports per Station 1.9
Data Status
Current
Last updated: Jan 28, 2026
Data sourced from U.S. DOE AFDC
8
Charging Stations
15
Total Ports
5
DC Fast Chargers
10
Level 2 Ports
Charging Networks
ChargePoint Network 7 (87.5%)
EV Connect 1 (12.5%)
Charging Stations in La Junta
PERKINS CHEVROLET GMC
22 EAST FIRST STREET
1 DC Fast
4 Level 2
J1772 (Level 2) CCS/SAE Combo
SECPA MAIN OFFICE
27850 Harris Rd
2 Level 2
J1772 (Level 2)
OTERO COLLEGE OTERO #2
55 Piñon St
2 Level 2
J1772 (Level 2)
OTERO COLLEGE OTERO #1
55 Piñon St
2 Level 2
J1772 (Level 2)
HION NETWORK LA JUNTA DC2
5 Walmart Way
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo
HION NETWORK LA JUNTA DC1
5 Walmart Way
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo
HION NETWORK LA JUNTA PL1
5 Walmart Way
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo
HION NETWORK LA JUNTA PL2
5 Walmart Way
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo
Local Insights
Strong Fast Charging Network
33% of charging ports in La Junta are DC fast chargers, providing good options for quick charging sessions.
ChargePoint Network Stronghold
ChargePoint Network leads the market in La Junta with 88% of stations, making their membership particularly valuable here.