Waterville, ME
Electric Vehicle Infrastructure & Adoption Analysis
ChargePoint Network Non-Networked Tesla
6
Charging Stations
Infrastructure Grade
A
50% DC Fast
Based on DC Fast Charger ratio
12 of 24 ports
Density Metrics
Total Stations 6
Ports per Station 4.0
Data Status
Current
Last updated: Jan 28, 2026
Data sourced from U.S. DOE AFDC
6
Charging Stations
24
Total Ports
12
DC Fast Chargers
10
Level 2 Ports
Charging Networks
ChargePoint Network 4 (66.7%)
Non-Networked 1 (16.7%)
Tesla 1 (16.7%)
Charging Stations in Waterville
Elm Plaza Shopping Mall - Tesla Supercharger
334 Main St
12 DC Fast
Tesla
Thomas College
180 W River Rd
2 Level 2
2 Level 1
J1772 (Level 2) NEMA 5-20
CM MOTORS CMMAG 1
420 Kennedy Memorial Drive
2 Level 2
J1772 (Level 2)
CM MOTORS CM TOYOTA 2
15 Airport Rd
2 Level 2
J1772 (Level 2)
CM MOTORS CM TOYOTA 1
15 Airport Rd
2 Level 2
J1772 (Level 2)
CM MOTORS CM CHRYSLER 1
300 Kennedy Memorial Dr
2 Level 2
J1772 (Level 2)
Local Insights
High-Speed Charging Hub
Waterville has exceptional DC fast charging coverage with 50% of ports being high-speed chargers, well above the national average.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Waterville with 67% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Waterville average 4.0 ports each, reducing wait times and improving charging accessibility.
Nearby Cities
Augusta, Maine
36 stations
27 km
Bangor, Maine
21 stations
78 km
Brunswick, Maine
19 stations
75 km
Auburn, Maine
18 stations
66 km
Rangeley, Maine
15 stations
83 km
Lewiston, Maine
13 stations
65 km
Topsham, Maine
10 stations
72 km
Ellsworth, Maine
10 stations
99 km
Bethel, Maine
9 stations
91 km
Bath, Maine
8 stations
72 km