Patuxent River, MD

Electric Vehicle Infrastructure & Adoption Analysis

Non-Networked
8
Charging Stations

Infrastructure Grade

F

0% DC Fast

Based on DC Fast Charger ratio

0 of 36 ports

Density Metrics

Total Stations 8
Ports per Station 4.5

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

8
Charging Stations
36
Total Ports
0
DC Fast Chargers
36
Level 2 Ports

Charging Networks

Non-Networked 8 (100%)

Charging Stations in Patuxent River

Naval Facilities Engineering Command - Naval Support Activity Patuxent River - Building 504

22268 Cedar Point Rd
Non-Networked
8 Level 2
J1772 (Level 2)

NAS PAX RIVER / N47608-B2272-1

47123 Buse Rd
Non-Networked
8 Level 2
NEMA 14-50

NAS PAX RIVER / N47608-B2185-1

22347 Cedar Point Rd
Non-Networked
6 Level 2
NEMA 14-50

NAS Pax River / N47608-B2187-1,2

504 Peary Rd
Non-Networked
4 Level 2
J1772 (Level 2)

NAS PAX RIVER / N47608-B534-1

534 Milstone Rd
Non-Networked
4 Level 2
NEMA 14-50

NAS Pax River / N47608-B506-1

504 Peary Rd
Non-Networked
2 Level 2
J1772 (Level 2)

NEX NAS Patuxent River

2209 Cuddihy Rd
Non-Networked
2 Level 2
J1772 (Level 2)

NAS PAX RIVER / N47608-B2817-1

Hoise Rd
Non-Networked
2 Level 2
NEMA 14-50

Local Insights

Level 2 Focused Infrastructure

Patuxent River's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in Patuxent River with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Patuxent River average 4.5 ports each, reducing wait times and improving charging accessibility.

Nearby Cities