Beverly, MA

Electric Vehicle Infrastructure & Adoption Analysis

ChargePoint Network Non-Networked Blink Network AMPUP
42
Charging Stations

Infrastructure Grade

F

0% DC Fast

Based on DC Fast Charger ratio

0 of 114 ports

Density Metrics

Total Stations 42
Ports per Station 2.7

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

42
Charging Stations
114
Total Ports
0
DC Fast Chargers
114
Level 2 Ports

Charging Networks

ChargePoint Network 36 (85.7%)
Non-Networked 3 (7.1%)
Blink Network 2 (4.8%)
AMPUP 1 (2.4%)

Charging Stations in Beverly

Cummings Center

100 Cummings Center
Non-Networked
30 Level 2
J1772 (Level 2)

Beverly Police Department

175 Elliott St
AMPUP
4 Level 2
J1772 (Level 2)

National Grid - Beverly

44 River St
Non-Networked
3 Level 2
J1772 (Level 2)

Electric Insurance Co

75 Sam Fonzo Dr
Non-Networked
2 Level 2
J1772 (Level 2)

ENDICOTT EC GARAGE FLR 3

Endicott Drive
ChargePoint Network
2 Level 2
J1772 (Level 2)

TOZER STATION 4

30 Tozer Rd
ChargePoint Network
2 Level 2
J1772 (Level 2)

TOZER STATION 2

30 Tozer Rd
ChargePoint Network
2 Level 2
J1772 (Level 2)

ENDICOTT EC GARAGE FLR 2

Endicott Drive
ChargePoint Network
2 Level 2
J1772 (Level 2)

ENDICOTT EC1

Endicott Drive
ChargePoint Network
2 Level 2
J1772 (Level 2)

TOZER STATION 3

30 Tozer Rd
ChargePoint Network
2 Level 2
J1772 (Level 2)

TOZER STATION 1

30 Tozer Rd
ChargePoint Network
2 Level 2
J1772 (Level 2)

CUMMINGS PROP WEST GARAGE 1

950 Cummings Center
ChargePoint Network
2 Level 2
J1772 (Level 2)

CUMMINGS PROP WEST GARAGE 2

950 Cummings Center
ChargePoint Network
2 Level 2
J1772 (Level 2)

CUMMINGS PROP WEST GARAGE 3

950 Cummings Center
ChargePoint Network
2 Level 2
J1772 (Level 2)

CUMMINGS PROP WEST GARAGE 4

950 Cummings Center
ChargePoint Network
2 Level 2
J1772 (Level 2)

CUMMINGS PROP WEST GARAGE 5

950 Cummings Center
ChargePoint Network
2 Level 2
J1772 (Level 2)

CUMMINGS PROP 800 CUMMINGSC 1

800 Cummings Center
ChargePoint Network
2 Level 2
J1772 (Level 2)

CUMMINGS PROP 800 CUMMINGSC 3

800 Cummings Center
ChargePoint Network
2 Level 2
J1772 (Level 2)

CUMMINGS PROP 50 BALCH 1

50 Balch St
ChargePoint Network
2 Level 2
J1772 (Level 2)

CUMMINGS PROP 50 BALCH 2

50 Balch St
ChargePoint Network
2 Level 2
J1772 (Level 2)

Showing top 20 stations by charging capacity. Visit AFDC for complete listings.

Local Insights

Level 2 Focused Infrastructure

Beverly's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Beverly with 86% of stations, making their membership particularly valuable here.

Nearby Cities