Ridgeland, MS

Electric Vehicle Infrastructure & Adoption Analysis

ChargePoint Network Tesla Destination Non-Networked EV Connect
12
Charging Stations

Infrastructure Grade

C

29% DC Fast

Based on DC Fast Charger ratio

7 of 24 ports

Density Metrics

Total Stations 12
Ports per Station 2.0

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

12
Charging Stations
24
Total Ports
7
DC Fast Chargers
17
Level 2 Ports

Charging Networks

ChargePoint Network 8 (66.7%)
Tesla Destination 2 (16.7%)
Non-Networked 1 (8.3%)
EV Connect 1 (8.3%)

Charging Stations in Ridgeland

SpringHill Suites by Marriott Jackson/Ridgeland - Tesla Destination

121 Southtowne Ave
Tesla Destination
6 Level 2
J1772 (Level 2) Tesla

Embassy Suites Jackson - North/Ridgeland - Tesla Destination

200 Township Pl
Tesla Destination
6 Level 2
J1772 (Level 2) Tesla

L830 SALES STATION 2

455 Steed Rd
ChargePoint Network
2 Level 2
J1772 (Level 2)

L830 SALES STATION 1

455 Steed Rd
ChargePoint Network
2 Level 2
J1772 (Level 2)

EML DCFC RENAISSANCE #1

1016 Highland Colony Pkwy
ChargePoint Network
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

EML DCFC RENAISSANCE #2

1016 Highland Colony Pkwy
ChargePoint Network
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

Ridgeland Mitsubishi

1860 E County Line Rd
Non-Networked
1 Level 2
J1772 (Level 2)

HH NORTH NORTH CHARGER 2

450 Steed Rd
ChargePoint Network
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

HH NORTH NORTH CHARGER 1

450 Steed Rd
ChargePoint Network
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

GM - CADILLAC OF JACKSON

700 Adcock St.
EV Connect
1 DC Fast
CCS/SAE Combo

L830 SVC 1

455 Steed Rd
ChargePoint Network
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

L830 SVC 2

455 Steed Rd
ChargePoint Network
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

Local Insights

ChargePoint Network Stronghold

ChargePoint Network leads the market in Ridgeland with 67% of stations, making their membership particularly valuable here.

Nearby Cities