Farmington, MO
Electric Vehicle Infrastructure & Adoption Analysis
FCN RED_E
2
Charging Stations
Infrastructure Grade
A
75% DC Fast
Based on DC Fast Charger ratio
6 of 8 ports
Density Metrics
Total Stations 2
Ports per Station 4.0
Data Status
Current
Last updated: Jan 28, 2026
Data sourced from U.S. DOE AFDC
2
Charging Stations
8
Total Ports
6
DC Fast Chargers
2
Level 2 Ports
Charging Networks
FCN 1 (50%)
RED_E 1 (50%)
Charging Stations in Farmington
Francios Fields - Farmington
696 Walton Dr
4 DC Fast
2 Level 2
CHAdeMO (DC Fast) J1772 (Level 2) CCS/SAE Combo
Auffenberg Chevrolet Buick GMC Farmington MO
830 Valley Creek Dr
2 DC Fast
CCS/SAE Combo
Local Insights
High-Speed Charging Hub
Farmington has exceptional DC fast charging coverage with 75% of ports being high-speed chargers, well above the national average.
High-Capacity Stations
Charging stations in Farmington average 4.0 ports each, reducing wait times and improving charging accessibility.
Nearby Cities
St. Louis, Missouri
136 stations
95 km
Clayton, Missouri
20 stations
96 km
Chesterfield, Missouri
15 stations
98 km
Saint Louis, Missouri
13 stations
88 km
Cape Girardeau, Missouri
12 stations
93 km
Fenton, Missouri
8 stations
82 km
Creve Coeur, Missouri
8 stations
98 km
Festus, Missouri
7 stations
47 km
Ballwin, Missouri
6 stations
89 km
Sullivan, Missouri
6 stations
80 km