Hastings, NE

Electric Vehicle Infrastructure & Adoption Analysis

ChargePoint Network EV Connect
4
Charging Stations

Infrastructure Grade

B

38% DC Fast

Based on DC Fast Charger ratio

5 of 13 ports

Density Metrics

Total Stations 4
Ports per Station 3.3

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

4
Charging Stations
13
Total Ports
5
DC Fast Chargers
8
Level 2 Ports

Charging Networks

ChargePoint Network 2 (50%)
EV Connect 2 (50%)

Charging Stations in Hastings

Hastings Ford

3101 Osborne Dr W NE
EV Connect
4 DC Fast
4 Level 2
J1772 (Level 2) CCS/SAE Combo

RUSS'S MARKET RUSS MARKET ST2

611 N Burlington Ave
ChargePoint Network
2 Level 2
J1772 (Level 2)

CENTRAL CC CCC - HASTINGS

550 S Technical Blvd
ChargePoint Network
2 Level 2
J1772 (Level 2)

Jerry Spady Chevrolet GMC

2750 Osborne drive east
EV Connect
1 DC Fast
CCS/SAE Combo

Local Insights

Strong Fast Charging Network

38% of charging ports in Hastings are DC fast chargers, providing good options for quick charging sessions.

Nearby Cities