New Hartford, NY

Electric Vehicle Infrastructure & Adoption Analysis

ChargePoint Network VIALYNK Non-Networked EV Connect CHARGESMART_EV
19
Charging Stations

Infrastructure Grade

F

0% DC Fast

Based on DC Fast Charger ratio

0 of 114 ports

Density Metrics

Total Stations 19
Ports per Station 6.0

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

19
Charging Stations
114
Total Ports
0
DC Fast Chargers
114
Level 2 Ports

Charging Networks

ChargePoint Network 7 (36.8%)
VIALYNK 4 (21.1%)
Non-Networked 3 (15.8%)
EV Connect 2 (10.5%)
CHARGESMART_EV 2 (10.5%)
RED_E 1 (5.3%)

Charging Stations in New Hartford

167 Clinton Rd

167 Clinton Rd
EV Connect
19 Level 2
J1772 (Level 2)

Slocum-Dickson Medical Group

1729 Burrstone Rd
Non-Networked
14 Level 2
J1772 (Level 2)

EV Chargers

1729 Burrstone Rd
RED_E
14 Level 2
J1772 (Level 2)

Hampton Inn - New Hartford

201 Woods Park Drive
CHARGESMART_EV
10 Level 2
J1772 (Level 2)

TownePlace Suites New Hartford

4760 Clinton Road
CHARGESMART_EV
10 Level 2
J1772 (Level 2)

Tehan's Plaza - Red Lobster

4581 Commercial Drive
VIALYNK
8 Level 2
J1772 (Level 2)

Tehan's Plaza - Hannaford

4605 Commercial Drive
VIALYNK
8 Level 2
J1772 (Level 2)

Wag N Wheel Wash

3949 Oneida St
VIALYNK
6 Level 2
J1772 (Level 2)

Phaeton Motors

117 New Hartford St
VIALYNK
4 Level 2
J1772 (Level 2)

Reaves Dental

4301 Middle Settlement Rd
Non-Networked
4 Level 2
J1772 (Level 2)

NEW HARTFORD GW-1 1.2

8635 Clinton St
ChargePoint Network
2 Level 2
J1772 (Level 2)

NEW HARTFORD GW-1 1.3

8635 Clinton St
ChargePoint Network
2 Level 2
J1772 (Level 2)

NEW HARTFORD GW-1 1.4

8635 Clinton St
ChargePoint Network
2 Level 2
J1772 (Level 2)

NEW HARTFORD GW-1 1.5

8635 Clinton St
ChargePoint Network
2 Level 2
J1772 (Level 2)

NEW HARTFORD GW-1 1.6

8635 Clinton St
ChargePoint Network
2 Level 2
J1772 (Level 2)

NEW HARTFORD GW-1 1.1

8635 Clinton St
ChargePoint Network
2 Level 2
J1772 (Level 2)

Holiday Inn Utica (Burrstone Inn)

1777 Burrstone Rd
EV Connect
2 Level 2
J1772 (Level 2)

Carmella's Café

8530 Seneca Turnpike
Non-Networked
2 Level 2
J1772 (Level 2)

National Grid - Utica

221 Old Campion Rd
ChargePoint Network
1 Level 2
J1772 (Level 2)

Local Insights

Level 2 Focused Infrastructure

New Hartford's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 6 different charging networks available, EV drivers in New Hartford have excellent flexibility in choosing their preferred provider.

High-Capacity Stations

Charging stations in New Hartford average 6.0 ports each, reducing wait times and improving charging accessibility.

Nearby Cities