Arden, NC
Electric Vehicle Infrastructure & Adoption Analysis
Non-Networked Blink Network ChargePoint Network
6
Charging Stations
Infrastructure Grade
D
14% DC Fast
Based on DC Fast Charger ratio
3 of 21 ports
Density Metrics
Total Stations 6
Ports per Station 3.5
Data Status
Current
Last updated: Jan 28, 2026
Data sourced from U.S. DOE AFDC
6
Charging Stations
21
Total Ports
3
DC Fast Chargers
18
Level 2 Ports
Charging Networks
Non-Networked 4 (66.7%)
Blink Network 1 (16.7%)
ChargePoint Network 1 (16.7%)
Charging Stations in Arden
BMW Asheville
31 Skyland Inn Dr
10 Level 2
J1772 (Level 2)
Sunshine Chevrolet
100 Thunderland Cir
3 DC Fast
CCS/SAE Combo
Sunshine Chevrolet
100 Thunderland Cir
2 Level 2
J1772 (Level 2)
Retreat at Arden Farms
10 Arden Farms Lane
2 Level 2
J1772 (Level 2)
Ingles
346 Airport Road
2 Level 2
J1772 (Level 2)
SCB ARDEN PINES
106 Arden Pnes Trl
2 Level 2
J1772 (Level 2)
Local Insights
Level 2 Focused Infrastructure
Arden's charging network emphasizes Level 2 charging (86% of ports), ideal for overnight and workplace charging.
Non-Networked Stronghold
Non-Networked leads the market in Arden with 67% of stations, making their membership particularly valuable here.
Nearby Cities
Greenville, South Carolina
77 stations
73 km
Asheville, North Carolina
70 stations
11 km
Pigeon Forge, Tennessee
32 stations
97 km
Greer, South Carolina
23 stations
71 km
Spartanburg, South Carolina
19 stations
81 km
Johnson City, Tennessee
16 stations
98 km
Hendersonville, North Carolina
13 stations
20 km
Waynesville, North Carolina
11 stations
41 km
Highlands, North Carolina
11 stations
75 km
Greeneville, Tennessee
10 stations
86 km