Arden, NC

Electric Vehicle Infrastructure & Adoption Analysis

Non-Networked Blink Network ChargePoint Network
6
Charging Stations

Infrastructure Grade

D

14% DC Fast

Based on DC Fast Charger ratio

3 of 21 ports

Density Metrics

Total Stations 6
Ports per Station 3.5

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

6
Charging Stations
21
Total Ports
3
DC Fast Chargers
18
Level 2 Ports

Charging Networks

Non-Networked 4 (66.7%)
Blink Network 1 (16.7%)
ChargePoint Network 1 (16.7%)

Charging Stations in Arden

BMW Asheville

31 Skyland Inn Dr
Non-Networked
10 Level 2
J1772 (Level 2)

Sunshine Chevrolet

100 Thunderland Cir
Non-Networked
3 DC Fast
CCS/SAE Combo

Sunshine Chevrolet

100 Thunderland Cir
Non-Networked
2 Level 2
J1772 (Level 2)

Retreat at Arden Farms

10 Arden Farms Lane
Blink Network
2 Level 2
J1772 (Level 2)

Ingles

346 Airport Road
Non-Networked
2 Level 2
J1772 (Level 2)

SCB ARDEN PINES

106 Arden Pnes Trl
ChargePoint Network
2 Level 2
J1772 (Level 2)

Local Insights

Level 2 Focused Infrastructure

Arden's charging network emphasizes Level 2 charging (86% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in Arden with 67% of stations, making their membership particularly valuable here.

Nearby Cities