Morehead City, NC
Electric Vehicle Infrastructure & Adoption Analysis
ChargePoint Network EV Connect Blink Network Tesla FORD_CHARGE
5
Charging Stations
Infrastructure Grade
A
89% DC Fast
Based on DC Fast Charger ratio
17 of 19 ports
Density Metrics
Total Stations 5
Ports per Station 3.8
Data Status
Current
Last updated: Jan 28, 2026
Data sourced from U.S. DOE AFDC
5
Charging Stations
19
Total Ports
17
DC Fast Chargers
2
Level 2 Ports
Charging Networks
ChargePoint Network 1 (20%)
EV Connect 1 (20%)
Blink Network 1 (20%)
Tesla 1 (20%)
FORD_CHARGE 1 (20%)
Charging Stations in Morehead City
Morehead Plaza Shopping Center - Tesla Supercharger
2900 Arendell St
12 DC Fast
Tesla
UCF ON BRIDGES UCF
2900 Bridges St
2 Level 2
J1772 (Level 2)
Kurtis Chevrolet
5369 Highway 70 W
2 DC Fast
CCS/SAE Combo
Lookout Ford
5557 US-70
2 DC Fast
CCS/SAE Combo
PARKER BUICK GMC
4813 ARENDELL ST
1 DC Fast
CCS/SAE Combo
Local Insights
High-Speed Charging Hub
Morehead City has exceptional DC fast charging coverage with 89% of ports being high-speed chargers, well above the national average.
Diverse Network Coverage
With 5 different charging networks available, EV drivers in Morehead City have excellent flexibility in choosing their preferred provider.
Nearby Cities
New Bern, North Carolina
18 stations
46 km
Jacksonville, North Carolina
15 stations
55 km
Kinston, North Carolina
8 stations
94 km
Beaufort, North Carolina
6 stations
12 km
Havelock, North Carolina
4 stations
20 km
Camp Lejeune, North Carolina
4 stations
51 km
Washington, North Carolina
3 stations
96 km
Oriental, North Carolina
2 stations
33 km
Cherry Point, North Carolina
2 stations
21 km
Hampstead, North Carolina
2 stations
80 km