Pickerington, OH

Electric Vehicle Infrastructure & Adoption Analysis

ChargePoint Network eVgo Network
8
Charging Stations

Infrastructure Grade

C

29% DC Fast

Based on DC Fast Charger ratio

5 of 17 ports

Density Metrics

Total Stations 8
Ports per Station 2.1

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

8
Charging Stations
17
Total Ports
5
DC Fast Chargers
12
Level 2 Ports

Charging Networks

ChargePoint Network 7 (87.5%)
eVgo Network 1 (12.5%)

Charging Stations in Pickerington

Shoppes at Stonecreek

1500 Stonecreek Dr S
eVgo Network
4 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

PICKERINGTON EV 1

115 N Center St
ChargePoint Network
2 Level 2
J1772 (Level 2)

PICKERINGTON EV 2

115 N Center St
ChargePoint Network
2 Level 2
J1772 (Level 2)

PICK TOWN PMH 3 NORTH LOT

1020 Refugee Rd
ChargePoint Network
2 Level 2
J1772 (Level 2)

PICK TOWN PMH 4 NORTH LOT

1020 Refugee Rd
ChargePoint Network
2 Level 2
J1772 (Level 2)

PICK TOWN PMH 1 ER LOT

1020 Refugee Rd
ChargePoint Network
2 Level 2
J1772 (Level 2)

PICK TOWN PMH 2 ER LOT

1020 Refugee Rd
ChargePoint Network
2 Level 2
J1772 (Level 2)

PICKERINGTON EV 3

10503 Blacklick-Eastern Rd NW
ChargePoint Network
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

Local Insights

ChargePoint Network Stronghold

ChargePoint Network leads the market in Pickerington with 88% of stations, making their membership particularly valuable here.

Nearby Cities