Bartlesville, OK

Electric Vehicle Infrastructure & Adoption Analysis

EV Connect Non-Networked
3
Charging Stations

Infrastructure Grade

A

67% DC Fast

Based on DC Fast Charger ratio

2 of 3 ports

Density Metrics

Total Stations 3
Ports per Station 1.0

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

3
Charging Stations
3
Total Ports
2
DC Fast Chargers
1
Level 2 Ports

Charging Networks

EV Connect 2 (66.7%)
Non-Networked 1 (33.3%)

Charging Stations in Bartlesville

Bartlesville Chrysler Dodge Ram Jeep

3250 SE Washington Blvd
Non-Networked
1 Level 2
J1772 (Level 2)

Patriot Buick GMC - Bartlesville

2001 SE WASHINGTON BLVD
EV Connect
1 DC Fast
CCS/SAE Combo

Patriot Chevrolet - Bartlesville

3800 South East Adams Rd
EV Connect
1 DC Fast
CCS/SAE Combo

Local Insights

High-Speed Charging Hub

Bartlesville has exceptional DC fast charging coverage with 67% of ports being high-speed chargers, well above the national average.

EV Connect Stronghold

EV Connect leads the market in Bartlesville with 67% of stations, making their membership particularly valuable here.

Nearby Cities