Woodward, OK
Electric Vehicle Infrastructure & Adoption Analysis
FCN
2
Charging Stations
Infrastructure Grade
A
86% DC Fast
Based on DC Fast Charger ratio
12 of 14 ports
Density Metrics
Total Stations 2
Ports per Station 7.0
Data Status
Current
Last updated: Jan 28, 2026
Data sourced from U.S. DOE AFDC
2
Charging Stations
14
Total Ports
12
DC Fast Chargers
2
Level 2 Ports
Charging Networks
FCN 2 (100%)
Charging Stations in Woodward
Lot 9th & Texas
824 Texas Ave
8 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo
Northwestern EC
2925 Williams Ave
4 DC Fast
2 Level 2
CHAdeMO (DC Fast) J1772 (Level 2) CCS/SAE Combo
Local Insights
High-Speed Charging Hub
Woodward has exceptional DC fast charging coverage with 86% of ports being high-speed chargers, well above the national average.
FCN Stronghold
FCN leads the market in Woodward with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Woodward average 7.0 ports each, reducing wait times and improving charging accessibility.