Greeneville, TN

Electric Vehicle Infrastructure & Adoption Analysis

ChargePoint Network Non-Networked Tesla Destination
10
Charging Stations

Infrastructure Grade

A

50% DC Fast

Based on DC Fast Charger ratio

7 of 14 ports

Density Metrics

Total Stations 10
Ports per Station 1.4

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

10
Charging Stations
14
Total Ports
7
DC Fast Chargers
7
Level 2 Ports

Charging Networks

ChargePoint Network 7 (70%)
Non-Networked 2 (20%)
Tesla Destination 1 (10%)

Charging Stations in Greeneville

General Morgan Inn - Tesla Destination

111 N Main St
Tesla Destination
3 Level 2
Tesla

GEA-1 STATION 2 (TA)

195 Van Hill Rd
ChargePoint Network
2 DC Fast
CCS/SAE Combo

GEA-1 STATION 3 (TA)

195 Van Hill Rd
ChargePoint Network
2 DC Fast
CCS/SAE Combo

GEA-1 STATION 1 (TA)

195 Van Hill Rd
ChargePoint Network
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

Greeneville Light & Power System

110 N College St
Non-Networked
1 Level 2
J1772 (Level 2)

Bachman Bernard Chevrolet Buick GMC

3365 E Andrew Johnson Hwy
Non-Networked
1 Level 2
J1772 (Level 2)

GEA-1 STATION 2 (R)

885 W Andrew Johnson Hwy
ChargePoint Network
1 DC Fast
CCS/SAE Combo Tesla

GEA-1 STATION 1 (L)

885 W Andrew Johnson Hwy
ChargePoint Network
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

FIRST TN HRA GVILLE CONNECT1

217 South College Street
ChargePoint Network
1 Level 2
J1772 (Level 2)

FIRST TN HRA GVILLE CONNECT2

217 South College Street
ChargePoint Network
1 Level 2
J1772 (Level 2)

Local Insights

High-Speed Charging Hub

Greeneville has exceptional DC fast charging coverage with 50% of ports being high-speed chargers, well above the national average.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Greeneville with 70% of stations, making their membership particularly valuable here.

Nearby Cities