Oneida, TN

Electric Vehicle Infrastructure & Adoption Analysis

Non-Networked ChargePoint Network
2
Charging Stations

Infrastructure Grade

F

0% DC Fast

Based on DC Fast Charger ratio

0 of 3 ports

Density Metrics

Total Stations 2
Ports per Station 1.5

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

2
Charging Stations
3
Total Ports
0
DC Fast Chargers
3
Level 2 Ports

Charging Networks

Non-Networked 1 (50%)
ChargePoint Network 1 (50%)

Charging Stations in Oneida

TOWN OF ONEIDA ONEIDA CITY HAL

19922 Municipal Dr
ChargePoint Network
2 Level 2
J1772 (Level 2)

Big South Fork National River and Recreation Area

4564 Leatherwood Rd
Non-Networked
1 Level 2
J1772 (Level 2)

Local Insights

Level 2 Focused Infrastructure

Oneida's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Nearby Cities