Fulshear, TX

Electric Vehicle Infrastructure & Adoption Analysis

GRAVITI_ENERGY SHELL_RECHARGE
3
Charging Stations

Infrastructure Grade

A

67% DC Fast

Based on DC Fast Charger ratio

14 of 21 ports

Density Metrics

Total Stations 3
Ports per Station 7.0

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

3
Charging Stations
21
Total Ports
14
DC Fast Chargers
7
Level 2 Ports

Charging Networks

GRAVITI_ENERGY 2 (66.7%)
SHELL_RECHARGE 1 (33.3%)

Charging Stations in Fulshear

6750 FM 1463 Rd

6750 FM 1463 Rd
SHELL_RECHARGE
8 DC Fast
CCS/SAE Combo

Instinct Athletics Fulshear

6640 FM 359
GRAVITI_ENERGY
7 Level 2
J1772 (Level 2)

Cross Creek Shoppes

6531 W Cross Creek Bend Ln
GRAVITI_ENERGY
6 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo

Local Insights

High-Speed Charging Hub

Fulshear has exceptional DC fast charging coverage with 67% of ports being high-speed chargers, well above the national average.

GRAVITI_ENERGY Stronghold

GRAVITI_ENERGY leads the market in Fulshear with 67% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Fulshear average 7.0 ports each, reducing wait times and improving charging accessibility.

Nearby Cities