Junction, TX
Electric Vehicle Infrastructure & Adoption Analysis
Tesla Electrify America Non-Networked SHELL_RECHARGE ChargePoint Network
5
Charging Stations
Infrastructure Grade
A
92% DC Fast
Based on DC Fast Charger ratio
22 of 24 ports
Density Metrics
Total Stations 5
Ports per Station 4.8
Data Status
Current
Last updated: Jan 28, 2026
Data sourced from U.S. DOE AFDC
5
Charging Stations
24
Total Ports
22
DC Fast Chargers
2
Level 2 Ports
Charging Networks
Tesla 1 (20%)
Electrify America 1 (20%)
Non-Networked 1 (20%)
SHELL_RECHARGE 1 (20%)
ChargePoint Network 1 (20%)
Charging Stations in Junction
Rowe Chevron - Tesla Supercharger
2415 N Main Street
8 DC Fast
Tesla
Junction
2416 North Main J
7 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo
Econo Lodge (Junction, TX)
111 Martinez St.
4 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo
Segovia Truck Stop
465 Old Segovia Rd
3 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo
TPWD STATE PARK S LLANO RIV SP
1947 Park Rd 73
2 Level 2
J1772 (Level 2)
Local Insights
High-Speed Charging Hub
Junction has exceptional DC fast charging coverage with 92% of ports being high-speed chargers, well above the national average.
Diverse Network Coverage
With 5 different charging networks available, EV drivers in Junction have excellent flexibility in choosing their preferred provider.
High-Capacity Stations
Charging stations in Junction average 4.8 ports each, reducing wait times and improving charging accessibility.