Jensen, UT

Electric Vehicle Infrastructure & Adoption Analysis

Non-Networked
2
Charging Stations

Infrastructure Grade

F

0% DC Fast

Based on DC Fast Charger ratio

0 of 3 ports

Density Metrics

Total Stations 2
Ports per Station 1.5

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

2
Charging Stations
3
Total Ports
0
DC Fast Chargers
1
Level 2 Ports

Charging Networks

Non-Networked 2 (100%)

Charging Stations in Jensen

4-4 GRRC Electrical Charging Station

Highway 149
Non-Networked
1 Level 2
J1772 (Level 2)

IMRO: DINO 4-3 Quarry Visitor Center Electric Car Charging Stations

11625 E 1500 S
Non-Networked
2 Level 1
NEMA 5-20

Local Insights

Level 2 Focused Infrastructure

Jensen's charging network emphasizes Level 2 charging (33% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in Jensen with 100% of stations, making their membership particularly valuable here.

Nearby Cities