Moab, UT
Electric Vehicle Infrastructure & Adoption Analysis
Non-Networked Tesla Tesla Destination Blink Network Electrify America
9
Charging Stations
Infrastructure Grade
A
51% DC Fast
Based on DC Fast Charger ratio
20 of 39 ports
Density Metrics
Total Stations 9
Ports per Station 4.3
Data Status
Current
Last updated: Jan 28, 2026
Data sourced from U.S. DOE AFDC
9
Charging Stations
39
Total Ports
20
DC Fast Chargers
18
Level 2 Ports
Charging Networks
Non-Networked 3 (33.3%)
Tesla 2 (22.2%)
Tesla Destination 2 (22.2%)
Blink Network 1 (11.1%)
Electrify America 1 (11.1%)
Charging Stations in Moab
Hyatt Place - Tesla Supercharger
890 N Main St
8 DC Fast
CCS/SAE Combo Tesla
RMP Moab (Moab, UT)
1850 N Hwy 191
8 DC Fast
CCS/SAE Combo
Element Moab
1431 North Highway 191
6 Level 2
J1772 (Level 2)
Field Station Moab - Tesla Destination
889 N Main St
6 Level 2
J1772 (Level 2) Tesla
Best Western Plus Canyonlands Moab - Tesla Supercharger
16 South Main Street
4 DC Fast
Tesla
Homewood Suites by Hilton Moab - Tesla Destination
132 N Main St
2 Level 2
J1772 (Level 2) Tesla
Gonzo Inn
100 W 200 S
2 Level 2
J1772 (Level 2)
Moab, UT Site - Queue Parking Lot
2021 N Highway 191
2 Level 2
NEMA 14-50
Moab, UT Site - Main Parking Lot
2021 N Highway 191
1 Level 1
NEMA 5-20
Local Insights
High-Speed Charging Hub
Moab has exceptional DC fast charging coverage with 51% of ports being high-speed chargers, well above the national average.
Diverse Network Coverage
With 5 different charging networks available, EV drivers in Moab have excellent flexibility in choosing their preferred provider.
High-Capacity Stations
Charging stations in Moab average 4.3 ports each, reducing wait times and improving charging accessibility.