Stowe, VT
Electric Vehicle Infrastructure & Adoption Analysis
ChargePoint Network Tesla Destination AMPUP Non-Networked RED_E
21
Charging Stations
Infrastructure Grade
F
2% DC Fast
Based on DC Fast Charger ratio
1 of 42 ports
Density Metrics
Total Stations 21
Ports per Station 2.0
Data Status
Current
Last updated: Jan 28, 2026
Data sourced from U.S. DOE AFDC
21
Charging Stations
42
Total Ports
1
DC Fast Chargers
41
Level 2 Ports
Charging Networks
ChargePoint Network 13 (61.9%)
Tesla Destination 4 (19%)
AMPUP 2 (9.5%)
Non-Networked 1 (4.8%)
RED_E 1 (4.8%)
Charging Stations in Stowe
Topnotch Resort & Spa - Tesla Destination
4000 Mountain Rd
5 Level 2
J1772 (Level 2) Tesla
Stowe Mountain Lodge 2 - Tesla Destination
7412 Mountain Rd
4 Level 2
Tesla
Topnotch Resort - Tesla Destination
4000 Mountain Resort
3 Level 2
Tesla
STOWE ELECTRIC GREEN MT INN
2 Park Pl
2 Level 2
J1772 (Level 2)
STOWE ELECTRIC TRAPP BREWERY
1333 Luce Hill Rd
2 Level 2
J1772 (Level 2)
STOWE ELECTRIC MILLS OF MOSCOW
431 Moscow Rd
2 Level 2
J1772 (Level 2)
STOWE ELECTRIC REC PATH
137 Main Street Stowe Rec Path
2 Level 2
J1772 (Level 2)
STOWE ELECTRIC STOWEFLAKE
1208 Cape Cod Rd
2 Level 2
J1772 (Level 2)
STOWE ELECTRIC AMER. FLATBREAD
1190 Mountain Rd American Flatbread
2 Level 2
J1772 (Level 2)
Stowe Mountain Lodge - Tesla Destination
7412 Mountain Rd
2 Level 2
J1772 (Level 2) Tesla
Northern Lights Lodge
4441 Mountain Rd
2 Level 2
J1772 (Level 2)
STOWE ELECTRIC STOWE HIGH SCHL
413 Barrows Rd
2 Level 2
J1772 (Level 2)
STOWE ELECTRIC STOWE KITCHEN
1813 Mountain Rd
2 Level 2
J1772 (Level 2)
Stowe Mountain Resort
5402 Mountain Rd
2 Level 2
J1772 (Level 2)
Stowe Mountain Resort 2
5402 Mountain Rd
2 Level 2
J1772 (Level 2)
STOWE ELECTRIC THOMPSON PARK
2699 Mountain Rd
1 DC Fast
CHAdeMO (DC Fast) CCS/SAE Combo
VILLAGE GREEN STATION 1
146 Village Green Dr
1 Level 2
J1772 (Level 2)
VILLAGE GREEN STATION 3
1003 Cape Cod Road
1 Level 2
J1772 (Level 2)
VILLAGE GREEN STATION 4
1003 Cape Cod Road
1 Level 2
J1772 (Level 2)
VILLAGE GREEN STATION 2
1003 Cape Cod Road
1 Level 2
J1772 (Level 2)
Showing top 20 stations by charging capacity. Visit AFDC for complete listings.
Local Insights
Level 2 Focused Infrastructure
Stowe's charging network emphasizes Level 2 charging (98% of ports), ideal for overnight and workplace charging.
Diverse Network Coverage
With 5 different charging networks available, EV drivers in Stowe have excellent flexibility in choosing their preferred provider.
Nearby Cities
Burlington, Vermont
93 stations
38 km
South Burlington, Vermont
40 stations
37 km
Plattsburgh, New York
34 stations
65 km
Montpelier, Vermont
26 stations
28 km
Rutland, Vermont
18 stations
100 km
Middlebury, Vermont
17 stations
63 km
Lebanon, New Hampshire
15 stations
98 km
Waterbury, Vermont
12 stations
15 km
Waitsfield, Vermont
11 stations
34 km
Colchester, Vermont
11 stations
35 km