Grafton, WV

Electric Vehicle Infrastructure & Adoption Analysis

Non-Networked Blink Network
2
Charging Stations

Infrastructure Grade

F

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

Density Metrics

Total Stations 2
Ports per Station 1.0

Data Status

Current

Last updated: Jan 28, 2026

Data sourced from U.S. DOE AFDC

2
Charging Stations
2
Total Ports
0
DC Fast Chargers
2
Level 2 Ports

Charging Networks

Non-Networked 1 (50%)
Blink Network 1 (50%)

Charging Stations in Grafton

Tygart Lake State Park

1240 Paul E Malone Rd
Non-Networked
1 Level 2
J1772 (Level 2)

Tygart Lake State Park

1240 Paul E. Malone Road
Blink Network
1 Level 2
J1772 (Level 2)

Local Insights

Level 2 Focused Infrastructure

Grafton's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Nearby Cities